Is Cherry Grove landing at

53rd closed because of the bridge?

I was told they were working on a temporary bridge at 52nd ave while the new one at 53 is being built. With the houses on that side of the creek, I would think they would have to give people access.

18’ Hewes Bayfisher/115 4 Stroke Yamaha/6’Powerpole, etc

sure hope there is some access…the inlet is pretty silted in and and hard to navigate except at high tide. even then, you better watch out!

Temporary bridge on 52nd. We gigged last night. Saw a couple dozen, but only 1 keeper at 16". Still a tad cool. Water temp was 57. Not gonna be long though. Good thing is we saw a lot of baby flounder in the 5-10" range. Future looks bright.

Goozeman…Thanks for that report.

The fear of the LORD is the beginning of knowledge…Proverbs 1:7