She’s only about 6 months old herself! She wandered into my garage a few weeks ago, soaking wet, skin and bones, but the sweetest cat ever. I gave her some food and water, assuming she’d be gone the next day. Yeah, nah.
Back on topic, floor joists were delivered yesterday. Trusses will be delivered Thursday. Ill get new pics up next week. Heading to Keowee tomorrow morning for a much needed break.
Put a couple of 55 gallon drums out and start burning the scrap. It’ll pay big dividends in keeping the place clean and lowering your waste/haul bills.
Plus a good many of the tradesmen will clean up after themselves given a place, not all but as time goes on it sure helps
Good advice EF !
I always supplied plenty of whiskey to all my contractors
Deer meat and fish for the brick masons
If you have any scrap longer than 16in
Screw it in anywhere that you might be putting a towel rack,picture or cabinet
For us the colors for the inside were pretty easy, but we much have drove around and looked at 500 houses trying to decide what colors we liked the best.
Another thing to consider as far as paint goes, they usually put paint on the biggest sale of the year ( the big paint companies) around Labor Day, closing out this years inventory (or trying to, lol)
Anyway, keep your eye open around then and maybe save a few bucks on that.
Pretty much dried in. House wrap going on Monday, then doors and windows, shingles, etc. Electrical walk-through with builder and electrician on Tuesday. Hope I’m not forgetting anything as far as outlets, lighting, fans, switches, etc.
Y’all keep those tips and advice coming. It’s been very helpful and I appreciate it!
double up a truss in the garage or double band one so you can pull/ lift heavy things in there. I use mine a lot to lift the mower to change blades or even hang an outboard to work on.
even if finished you can put a big eye hook down for future reference.
run some conduit chases up into the attic and above areas for future wire runs also.
don’t forget to put a light in the shower ceiling and not just the center of the bathroom, we made that mistake.
Now is a good time to put blocking in for toilet paper holders, mirrors, and handicap rails (grab bars), for showers, and tub/shower combo’s. You don’t have to put grab bars in now, but having the blocking in is nice for when you’re ready for them. I generally use a drop from a 2x10 or 2x12, or even a drop from an LVL, to make it too big to miss when installing the fixtures. (taking pics helps, too)
It will make installations much easier down the road.
Loft, 18x54’, with a 10x18’ dormer for a pool table. Should’ve been dried in a week ago but inspectors are overwhelmed and running behind, due to the influx and expansion here.
We’re at 3052sqft living area and 4916sqft under roof. Right at $140sqft, currently, for a full custom-built house. Not bad in this market.